posted in:

  • Home>
  • Mining News
  • >
  • Africa,
  • >
  • Cardero announces maiden inferred resource estimate for Sheini Hills Iron Project, Ghana

Cardero - www.youroilandgasnews.com

Cardero announces maiden inferred resource estimate for Sheini Hills Iron Project, Ghana

Monday, Jan 14, 2013

Cardero Resource Corp. ("Cardero" or the "Company") (TSX:CDU)(NYSE MKT:CDY)(NYSE Amex:CDY)(FRANKFURT:CR5) announces the results of the maiden resource estimate for the Sheini Hills Iron Project, Ghana, undertaken by SRK Consulting (UK) Ltd. ("SRK"). SRK has reported an estimated inferred mineral resource of 1.3 Billion Tonnes ("Bt"), with mean grades of 33.8% Fe, 6.0% Al2O3, 37.3% SiO2 and 0.27% P, using a 15% cut-off grade, all of which falls within a Whittle optimization pit with a global strip ratio of 0.93.

Maiden Resource Estimate

SRK is preparing a National Instrument 43-101 ("NI 43-101") technical report, including a maiden resource estimate, for the Sheini Hills Iron Project in northeast Ghana ("SRK Report"). The maiden estimated mineral resource is calculated in accordance with CIM Standards on Mineral Resources and Reserves (CIM Guidelines) as set out in NI 43-101. The effective date of the SRK Report is January 7, 2013, and the completed SRK Report will be filed on SEDAR and made available through the Company's website within 45 days of this news release. Investors are urged to review the SRK Report in its entirety once it becomes available.

In total, SRK has reported an inferred mineral resource of 1.3 Bt, with mean grades of 33.8% Fe, 6.0% Al2O3, 37.3% SiO2 and 0.27% P (at a cutoff of 15% Fe), all of which falls within a Whittle optimisation pit which has a global strip ratio of 0.93 (waste tonnes:ore tonnes) and which was generated by SRK to restrict the estimated inferred mineral resource to material which has potential to be economically exploited.

The Company cautions that the accuracy of resource and reserve estimates is, in part, a function of the quality and quantity of available data and of engineering and geological interpretation and judgment. Given the data available at the time the SRK report was prepared, the estimates presented are considered reasonable. However, they should be accepted with the understanding that additional data and analysis available subsequent to the date of the estimates may necessitate revision. These revisions may be material. SRK is unaware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, and political or other relevant issues that may materially affect the mineral resources. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

Source: Marketwire

posted in:

  • Home>
  • Mining News
  • >
  • Africa,
  • >
  • Cardero announces maiden inferred resource estimate for Sheini Hills Iron Project, Ghana

Other Mining News

Ore grades spike in North Raise area of LKA's Golden wonder mine 21-04-2014
Marathon completes successful sprite zone winter drilling program, Valentine Lake property 18-04-2014
Aureus Mining Inc. - appointment of MonuRent to provide and maintain fleet for owner mining operation at the New Liberty Gold Project in Liberia 18-04-2014
Vista Gold Corp. announces option agreement on the Guadalupe de los Reyes project 16-04-2014
Ivanhoe Mines' drilling program extends depths of rich zinc and copper zones at the Kipushi Mine in D.R. Congo 16-04-2014
Vorkutaugol to commission 11 new coal faces across its mines in 2014 16-04-2014
Vanstar updates on Liam drilling 15-04-2014
Lakeland Resources Inc. acquires 5 new uranium properties in the Athabasca Basin 14-04-2014
Comstock Mining provides update 11-04-2014
Sierra Mining Limited announces registration of scheme booklet 11-04-2014

Advertisers